Projects

TVA Unit 1 fall outage

Comprised of Fabrication and Installation of High Pressure Heater Piping.  Piping ranged from 6” thru 18” and was 2 ¼ percent chrome with 100 percent x-ray.  Project also included several other miscellaneous piping projects.


TVA Unit 2 fall outage-

Comprised of several piping projects during installation of the new bottom ash system. Replaced 24 butterfly valves on DI Tanks with Pneumatic Operated valves and Fabricated and installed instrument control panels.


Fort Campbell, KY SOF and Working Dog Kennels

Plumbing installation for two new buildings on the Army base.  Project consisted of underground sanitary sewer and potable water, above ground water, gas, vent, and medical gas piping.  Mounting plumbing fixtures lavatories, water closets, urinals, showers, hose reels, hose bibs, backflow, gas fired water heater, & medical gas equipment.


Bridgestone Metalpha Sandbox Project

Consisted of Installation of pumps, blower, heat exchanger, and 2” stainless steel water piping.  All piping was heliarc welded and insulated.


US Smokeless Condensate & Vertical Pumps

Installation of two veriflo model 820 vertical sump pumps complete with piping and electrical.  Also installed a new flash recovery system consisting of installation of pumps, piping and vessels.


Fort Campbell, KY Boiler & Dual Temp Pumps

Sub-contracted under K-Hayes Limited.  Project consisted of demo and installation of new package boiler complete with all new piping and condensate receiver tank.  Demolition and Installation of eight dual temperature pumps complete with all new piping, electrical, and insulation.


TVA Fuel Oil Piping

Installation of 1,200 foot of new stainless steel schedule 40 fuel oil piping all welds were heliarc and 100% X-Ray.

Contact Us

3625 Prestwicke Place
Adams, TN 37010
Phone: 931-802-4402
Fax: 931-933-7683
Email: info@edwardsmc.com

Recent Projects

Certified Women Owned

Copyright @ 2013-2017 Edwards Mechanical Contractor, Inc.